- Roof Shingles removed to the dump site.
- Rood trusses dismantled.
- Wall Framing taken down.
- Flooring removed.
Next Steps:
- Lift the Floor Frame.
- Remove the foundation concrete blocks.
- Install the black plastic sheeting.
Framing |
Floor Frame. Not much of the insulation has survived. Why? Was it carted off by critters? |
No comments:
Post a Comment