26 July 2014

Excalibur 2 Project. Final Takedown.

Today was a good day at Excalibur 2. The weather was hot and steamy!





  1. Roof Shingles removed to the dump site.
  2. Rood trusses dismantled.
  3. Wall Framing taken down.
  4. Flooring removed.



Next Steps:
  1. Lift the Floor Frame.
  2. Remove the foundation concrete blocks.
  3. Install the black plastic sheeting.



Framing 


Floor Frame. Not much of the insulation has survived. Why? Was it carted off by critters?



No comments:

Post a Comment